|
1
|
595x595 WHITE COLOR PATTERN NO:975 BACK WITH ALU FOIL (THICK NESS 7.5MM PVC GY PSUM TILE) 3855.60 SQM
|
SUPER FALSE CEILING SYSTEMS
|
FOSHAN PRANCE BUILDING MATERIAL CO., LTD.
|
2017-06-24
|
CHINA
|
19700.00 KGS
|
|
2
|
595x595 WHITE COLOR PATTERN NO:603 BACK WITH ALU FOIL (THICK NESS 7.5MM PVC GY PSUM TILE) 3848.40 SQM
|
SUPER FALSE CEILING SYSTEMS
|
FOSHAN PRANCE BUILDING MATERIAL CO., LTD.
|
2017-06-24
|
CHINA
|
19700.00 KGS
|
|
3
|
MINERAL FIBER CEILING SIZE 595*595*12 MM
|
SHARDA CONSTRUCTION AND CORPORATION PVT. LTD.
|
FOSHAN PRANCE BUILDING MATERIAL CO
|
2016-04-21
|
CHINA
|
6250.00 KGS
|
|
4
|
EXPANSION SCREW ,SPRING CLIP, BOLT WITH HOOK (MS)
|
SHARDA CONSTRUCTION AND CORPORATION PVT. LTD.
|
FOSHAN PRANCE BUILDING MATERIAL CO
|
2016-04-21
|
CHINA
|
2.00 KGS
|
|
5
|
T GRID BLACK GROOVE (ALU.)
|
SHARDA CONSTRUCTION AND CORPORATION PVT. LTD.
|
FOSHAN PRANCE BUILDING MATERIAL CO
|
2016-04-21
|
CHINA
|
1768.00 KGS
|
|
6
|
EXPANSION SCREW ,SPRING CLIP, BOLT WITH HOOK (MS)
|
SHARDA CONSTRUCTION AND CORPORATION PVT. LTD.
|
FOSHAN PRANCE BUILDING MATERIAL CO
|
2016-04-21
|
CHINA
|
670.00 KGS
|
|
7
|
T GRID BLACK GROOVE (ALU.)(AG 7B)
|
SHARDA CONSTRUCTION AND CORPORATION PVT. LTD.
|
FOSHAN PRANCE BUILDING MATERIAL CO
|
2016-01-14
|
CHINA
|
1768.00 KGS
|
|
8
|
EXPANSION SCREW ,SPRING CLIP, BOLT WITH HOOK (MS)(AG 7B)
|
SHARDA CONSTRUCTION AND CORPORATION PVT. LTD.
|
FOSHAN PRANCE BUILDING MATERIAL CO
|
2016-01-14
|
CHINA
|
1.00 KGS
|
|
9
|
EXPANSION SCREW ,SPRING CLIP, BOLT WITH HOOK (MS)(AG 7B)
|
SHARDA CONSTRUCTION AND CORPORATION PVT. LTD.
|
FOSHAN PRANCE BUILDING MATERIAL CO
|
2016-01-14
|
CHINA
|
351.00 KGS
|
|
10
|
MINERAL FIBER CEILING SIZE 595*595*12 MM(AG 7B)
|
SHARDA CONSTRUCTION AND CORPORATION PVT. LTD.
|
FOSHAN PRANCE BUILDING MATERIAL CO
|
2016-01-14
|
CHINA
|
6110.00 KGS
|